by componto | May 3, 1992
The construction of horizontal warehouse With the emergence of so-called “non-grains”, farin products and pellets, with a very difficult dynamics inside the vertical silos, was inaugurated a horizontal warehouse automatic filling by superior route,...
by componto | May 3, 1987
The creation of Silopor In July, in conjunction with the silos of Beato and Trafaria (located in the port of Lisbon), the silos de Leixões were integrated in Silopor – Port Silos Company, a public limited company of public capital, created to embody the...
by componto | May 3, 1980
The expansion Inaugurated the 2nd phase of the silos de Leixões, with an expansion of the silo to a capacity of 105,000 tons of...
by componto | May 3, 1978
The inauguration The silos of Leixões were inaugurated in October and have integrated the sillar network EPAC-Public Company for Grains Supply, body which had the function to manage, under the corporate approach, all the previous public structure of coordinating...
by componto | May 3, 1978
The beginning The construction of silos de Leixões is started in the port land governed by private law of the Administration of the Douro and Leixões Ports (APDL), about 600 metres from the dock no.4 of the Port of Leixões, which was at the time in the finishing...
Recent Comments